Assessment Year | 2003 |
---|---|
Principal Product | Circuit Boards |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
150,000
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $339,893 | 6,664,449 |
kWh
|
$0.051 |
Electricity Demand | $28,324 | 14,933 |
kW-mo/yr
|
$1.90 |
Electricity Fees | $11,500 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,176 | $13 | n/a |
$924
18,111
kWh
|
$252
-
kW-mo/yr
|
- | - |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,653 | $16,060 | n/a |
$4,501
88,256
kWh
|
$1,152
-
kW-mo/yr
|
- | - |
03 | 2.7261: Install timers and/or thermostats | $4,492 | $4,010 | n/a |
$4,492
65,100
kWh
|
- | - | - |
04 | 2.4133: Use most efficient type of electric motors | $1,886 | $626 | n/a |
$1,361
26,689
kWh
|
$525
-
kW-mo/yr
|
- | - |
05 | 3.4155: Meter waste water | $1,545 | $1,700 | n/a | - | - |
$1,545
-
Tgal
|
- |
06 | 4.651: Install back-up equipment | $22,100 | $120,000 | n/a | - | - | - | $22,100 |
TOTAL RECOMMENDED | $36,852 | $142,409 |
$11,278
198,156
kWh
|
$1,929
-
kW-mo/yr
|
$1,545
-
Tgal
|
$22,100 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs