ITAC Assessment: UF0333
ITAC logo
ITAC Assessment: UF0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 150,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,893 6,664,449
kWh
Electricity Demand $28,324 14,933
kW-mo/yr
Electricity Fees $11,500 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Increase in Production Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,176 $13 n/a $924
18,111
kWh
$252
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,653 $16,060 n/a $4,501
88,256
kWh
$1,152
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $4,492 $4,010 n/a $4,492
65,100
kWh
- - -
04 2.4133: Use most efficient type of electric motors $1,886 $626 n/a $1,361
26,689
kWh
$525
-
kW-mo/yr
- -
05 3.4155: Meter waste water $1,545 $1,700 n/a - - $1,545
-
Tgal
-
06 4.651: Install back-up equipment $22,100 $120,000 n/a - - - $22,100
TOTAL RECOMMENDED $36,852 $142,409 $11,278
198,156
kWh
$1,929
-
kW-mo/yr
$1,545
-
Tgal
$22,100
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs