ITAC Assessment: UF0331
ITAC logo
ITAC Assessment: UF0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Flush Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range n/a
# of Employees 135
Plant Area 65,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 5,590
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,125 2,560,320
kWh
Electricity Demand $55,875 7,399
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4133: Use most efficient type of electric motors $6,357 $18,567 $4,424
83,467
kWh
$1,933
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,423 - $2,157
28,759
kWh
- - - $1,266
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,837 $11,405 $4,507
82,099
kWh
$1,330
-
kW-mo/yr
- - -
04 2.7131: Add area lighting switches $924 $1,649 $924
12,316
kWh
- - - -
05 2.6231: Utilize controls to operate equipment only when needed $7,190 $32,481 $7,190
95,869
kWh
- - - -
06 2.7313: Recycle air for heating, ventilation and air conditioning $14,275 $55,800 $10,932
206,271
kWh
$3,343
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $907 - $907
12,098
kWh
- - - -
08 4.431: Train operators for maximum operating efficiency $7,000 $3,000 - - - $7,000 -
09 4.423: Move product using mechanical means $2,340 $2,372 - - $2,340 - -
TOTAL RECOMMENDED $48,253 $125,274 $31,041
520,879
kWh
$6,606
-
kW-mo/yr
$2,340 $7,000 $1,266
TOTAL IMPLEMENTED $33,978 $69,474 $20,109
314,608
kWh
$3,263
-
kW-mo/yr
$2,340 $7,000 $1,266
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs