*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wooden doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 200,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,938 1,965,322
kWh
Natural Gas $8,075 905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4133: Use most efficient type of electric motors $1,630 - $1,630
23,550
kWh
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,198 - $7,829
113,138
kWh
$471 - $1,898 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $985 $5,476 $985
14,325
kWh
- - - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,892 $10,175 $4,132
63,182
kWh
$(-240.0) - - -
05 2.7131: Add area lighting switches $984 $4,290 $984
14,227
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,991 $376 $1,991
29,036
kWh
- - - -
07 2.6231: Utilize controls to operate equipment only when needed $39,320 $10,726 $19,370
279,912
kWh
- - - $19,950
08 2.8114: Change rate schedules or other changes in utility service $21,592 $110,000 - - $21,592 - -
09 4.445: Install equipment to move product $15,228 $5,300 $(-684.0)
(-9,892)
kWh
$15,912 - - -
10 4.444: Install system to collect scrap $7,800 $780 - $7,800 - - -
11 4.424: Improve space comfort conditioning $26,498 $49,051 $498
7,198
kWh
$26,000 - - -
TOTAL RECOMMENDED $130,118 $196,174 $36,735
534,676
kWh
$49,943 $21,592 $1,898 $19,950
TOTAL IMPLEMENTED $63,316 $132,107 $15,883
233,339
kWh
$23,943 $21,592 $1,898 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs