Assessment Year | 2024 |
---|---|
Principal Product | Dairy and non-dairy type flavors |
NAICS | 311930: Flavoring Syrup and Concentrate Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
500,000
ft2
|
Annual Production | 1,400,000
lb
|
Production Hrs. Annual | 2,444
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $53,437 | 803,424 |
kWh
|
$0.067 | |
Electricity Demand | $25,134 | 2,553 |
kW-mo/yr
|
$9.84 | |
Electricity Fees | $7,822 | - |
|
- | |
Natural Gas | $57,150 | 5,674 |
MMBtu
|
$10.07 | |
Waste Disposal Costs | |||||
Water Usage | $28,033 | 2,251 |
Tgal
|
$12.45 | |
TOTAL YEARLY COSTS | $171,575 | ||||
RECOMMENDED SAVINGS* | $55,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $5,852 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $38,901 | $233,678 |
$20,934
312,441
kWh
|
$17,968
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $3,597 | $3,641 |
$2,090
31,190
kWh
|
$1,507
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $979 | $608 | - | - |
$979
-
MMBtu
|
|
04 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $3,704 | $5,717 | - | - |
$3,704
-
MMBtu
|
|
05 | 2.7241: Install outside air damper / economizer on hvac unit | $6,982 | $44,890 |
$4,125
61,573
kWh
|
$2,386
-
kW-mo/yr
|
$470
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $1,276 | $1,797 |
$1,063
15,860
kWh
|
$214
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $55,439 | $290,331 |
$28,211
421,063
kWh
|
$22,075
-
kW-mo/yr
|
$5,153
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,852 | $6,047 |
$3,152
47,050
kWh
|
$1,721
-
kW-mo/yr
|
$979
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs