Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Magazines, Books, Periodicals, Pamphlets
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 160,000
ft2
Annual Production 83,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $688,306 16,160,231
kWh
Electricity Demand $747,934 38,921
kW-mo/yr
Electricity Fees $111,740 -
Natural Gas $274,394 47,385
MMBtu
TOTAL YEARLY COSTS $1,822,374
RECOMMENDED SAVINGS* $137,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,300 $440 $3,300
77,040
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $23,000 $43,000 $12,900
300,000
kWh
$10,100
-
kW-mo/yr
- -
03 2.8121: Apply for tax-free status for energy purchases $81,100 $8,000 - - $81,100 -
04 2.8226: Increase efficiency of trucks $25,700 $77,000 $700
15,800
kWh
- $25,000 -
05 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $4,470 - $30
800
kWh
- - $4,440
TOTAL RECOMMENDED $137,570 $128,440 $16,930
393,640
kWh
$10,100
-
kW-mo/yr
$106,100 $4,440
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs