Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Flight Simulators
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 210,000
ft2
Annual Production 7
pieces
Production Hrs. Annual 2,295
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,759 5,281,480
kWh
Electricity Demand $78,988 10,453
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,935 $119,640 $20,134
410,904
kWh
$7,801
-
kW-mo/yr
-
02 2.7132: Install timers on light switches in little used areas $20,300 $1,640 $20,300
317,179
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $1,246 - $1,030
21,024
kWh
$216
-
kW-mo/yr
-
04 2.6231: Utilize controls to operate equipment only when needed $15,812 $20,000 $10,797
220,354
kWh
$5,015
-
kW-mo/yr
-
05 2.7491: Insulate glazing, walls, ceilings, and roofs $31,940 $189,000 $31,940
499,073
kWh
- -
06 3.5318: Recycle fluorescent lamps $10,412 $1,895 - - $10,412
TOTAL RECOMMENDED $107,645 $332,175 $84,201
1,468,534
kWh
$13,032
-
kW-mo/yr
$10,412
TOTAL IMPLEMENTED $36,112 $21,640 $31,097
537,533
kWh
$5,015
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs