ITAC Assessment: CO0508
ITAC logo
ITAC Assessment: CO0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Specialty bolts, track spikes for railroads
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 48,750
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,540 2,416,050
kWh
Electricity Demand $84,183 9,803
kW-mo/yr
Natural Gas $130,798 35,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,450 $90 $3,260
66,600
kWh
$1,550
-
kW-mo/yr
- $(-360.0) -
02 2.3191: Use demand controller or load shedder $4,230 $7,000 - $4,230
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,570 $23,500 $2,460
50,300
kWh
$1,110
-
kW-mo/yr
- - -
04 3.3122: Use filtration, centrifuging to remove contaminants $31,960 $1,620 - - $3,330
-
gal
- $28,630
05 4.112: Replace old machine with new automatic multi-station tool $115,000 $100,000 - - - $120,000 $(-5,000.0)
TOTAL RECOMMENDED $159,210 $132,210 $5,720
116,900
kWh
$6,890
-
kW-mo/yr
$3,330
-
gal
$119,640 $23,630
TOTAL IMPLEMENTED $40,640 $8,710 $3,260
66,600
kWh
$5,780
-
kW-mo/yr
$3,330
-
gal
$(-360.0) $28,630
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs