ITAC Assessment: UF0309
ITAC logo
ITAC Assessment: UF0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Precision Metal Parts
NAICS
n/a
SIC 3483: Ammunition, Except for Small Arms
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 61,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,744
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,479 1,867,320
kWh
Electricity Demand $66,677 7,843
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $368,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,113 $340 $8,173
86,031
kWh
- $(-60.0) - -
02 2.6212: Turn off equipment during breaks, reduce operating time $1,774 $3,840 $1,774
18,669
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $9,173 $23,719 $6,470
107,832
kWh
$2,703
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $959 $256 $959
15,977
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,285 - $663
11,056
kWh
- $63 $559 -
06 3.5131: Recycle white water $334,620 $75,000 - - - - $334,620
07 4.448: Install automatic part storage / retreval system $1,560 $1,176 - - $1,560 - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $2,500 - - - - - $2,500
09 4.624: Hire additional personnel to reduce changeout time $8,100 $2,160 - - $8,100 - -
TOTAL RECOMMENDED $368,084 $106,491 $18,039
239,565
kWh
$2,703
-
kW-mo/yr
$9,663 $559 $337,120
TOTAL IMPLEMENTED $27,160 $30,059 $16,417
212,532
kWh
$2,703
-
kW-mo/yr
$8,040 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs