Assessment Year | 2002 |
---|---|
Principal Product | Aluminum and Vinyl Windows |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $5 M to 10M |
# of Employees | 120 |
Plant Area |
74,000
ft2
|
Annual Production | 75,000
pieces
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,093 | 1,342,968 |
kWh
|
$0.034 |
Electricity Demand | $19,407 | 4,322 |
kW-mo/yr
|
$4.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,675 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,465 | $10,121 | n/a |
$2,009
52,866
kWh
|
$456
-
kW-mo/yr
|
- | - |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,612 | $500 | n/a |
$6,630
125,100
kWh
|
- | $(-18.0) | - |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,366 | - | n/a |
$1,366
25,775
kWh
|
- | - | - |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,184 | $1,033 | n/a |
$5,184
97,815
kWh
|
- | - | - |
05 | 2.2511: Insulate bare equipment | $4,591 | $291 | n/a |
$3,105
81,704
kWh
|
- | - | $1,486 |
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $5,687 | $19,500 | n/a |
$5,687
107,311
kWh
|
- | - | - |
07 | 4.448: Install automatic part storage / retreval system | $4,770 | $864 | n/a | - | - | $4,770 | - |
TOTAL RECOMMENDED | $30,675 | $32,309 |
$23,981
490,571
kWh
|
$456
-
kW-mo/yr
|
$4,752 | $1,486 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs