Assessment Year | 2002 |
---|---|
Principal Product | Corrugated Containers |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 86 |
Plant Area |
250,000
ft2
|
Annual Production | 960,000
thousand feet
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $238,542 | 5,530,200 |
kWh
|
$0.043 |
Electricity Demand | $93,447 | 11,464 |
kW-mo/yr
|
$8.15 |
Natural Gas | $225,299 | 39,482 |
MMBtu
|
$5.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $404,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $334,077 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $12,096 | $7,584 |
$8,996
209,220
kWh
|
$3,100
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $21,281 | $33,167 |
$15,912
370,048
kWh
|
$5,369
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,902 | - |
$1,902
29,726
kWh
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,446 | $2,000 |
$1,446
22,592
kWh
|
- | - | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,119 | $1,162 |
$1,119
17,481
kWh
|
- | - | - | - | |
06 | 2.2135: Repair and eliminate steam leaks | $17,690 | $450 | - | - |
$17,690
-
MMBtu
|
- | - | |
07 | 2.1213: Direct warmest air to combustion intake | $64,232 | $59,000 | - | - |
$64,232
-
MMBtu
|
- | - | |
08 | 3.5311: Recover and reuse waste material | $4,950 | $362 | - | - | - | $4,950 | - | |
09 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $236,669 | $58,500 | - | - | - | - | $236,669 | |
10 | 4.125: | $2,700 | $864 | - | - | - | - | $2,700 | |
11 | 4.611: Begin a practice of predictive / preventative maintenance | $39,945 | $1,800 | - | - | - | $39,945 | - | |
TOTAL RECOMMENDED | $404,030 | $164,889 |
$29,375
649,067
kWh
|
$8,469
-
kW-mo/yr
|
$81,922
-
MMBtu
|
$44,895 | $239,369 | ||
TOTAL IMPLEMENTED | $334,077 | $103,863 |
$26,354
601,860
kWh
|
$8,469
-
kW-mo/yr
|
$17,690
-
MMBtu
|
$44,895 | $236,669 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs