ITAC Assessment: UF0294
ITAC logo
ITAC Assessment: UF0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Labels
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 76,000
ft2
Annual Production 28,500,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,772 2,656,097
kWh
Electricity Demand $32,542 6,992
kW-mo/yr
Natural Gas $183,031 21,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,846

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $2,667 $654 $2,667
48,315
kWh
- - - - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $5,905 $4,220 - - - $5,905
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $5,603 $14,749 $4,375
108,839
kWh
$1,228
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $651 - $651
11,798
kWh
- - - - -
05 2.2511: Insulate bare equipment $3,038 $820 - - $3,038
-
MMBtu
- - -
06 2.7134: Use photocell controls $4,538 $20,450 $2,841
70,720
kWh
$1,897
-
kW-mo/yr
- - $(-200.0) -
07 2.7491: Insulate glazing, walls, ceilings, and roofs $10,139 $18,574 $10,139
183,694
kWh
- - - - -
08 2.2511: Insulate bare equipment $8,307 $2,282 - - $8,307
-
MMBtu
- - -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $11,700 $7,000 - - - - $11,700 -
10 4.112: Replace old machine with new automatic multi-station tool $8,320 $32,000 - - - - $8,320 -
11 2.7491: Insulate glazing, walls, ceilings, and roofs $2,880 $13,500 - - - - - $2,880
TOTAL RECOMMENDED $63,748 $114,249 $20,673
423,366
kWh
$3,125
-
kW-mo/yr
$11,345
-
MMBtu
$5,905
-
MMBtu
$19,820 $2,880
TOTAL IMPLEMENTED $34,846 $58,623 $7,693
168,952
kWh
$1,228
-
kW-mo/yr
- $5,905
-
MMBtu
$20,020 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs