Assessment Year | 2002 |
---|---|
Principal Product | Bottled Soft Drinks |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | n/a |
# of Employees | 400 |
Plant Area |
232,400
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $411,047 | 9,081,344 |
kWh
|
$0.045 |
Electricity Demand | $133,756 | 18,439 |
kW-mo/yr
|
$7.25 |
Natural Gas | $61,540 | 24,371 |
MMBtu
|
$2.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $125,791 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,042 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $1,755 | $1,050 |
$406
9,023
kWh
|
$90
-
kW-mo/yr
|
- | - | $1,259 | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $4,427 | $192 |
$3,627
80,592
kWh
|
$800
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,917 | $6,752 |
$5,744
127,636
kWh
|
$1,173
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $22,067 | $40,280 |
$12,425
276,120
kWh
|
$10,266
-
kW-mo/yr
|
- | - | - | $(-624.0) | - | |
05 | 2.2135: Repair and eliminate steam leaks | $1,124 | $450 | - | - |
$1,124
-
MMBtu
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,424 | $490 |
$7,472
120,518
kWh
|
- | - | - | - | $(-48.0) | - | |
07 | 2.4133: Use most efficient type of electric motors | $15,235 | $25,190 |
$11,468
254,855
kWh
|
$3,767
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $17,341 | $2,600 | - | - |
$17,341
-
MMBtu
|
- | - | - | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $10,394 | $20,000 |
$8,515
189,216
kWh
|
$1,879
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 2.2191: Substitute hot process fluids for steam | $16,158 | - | - | - |
$16,158
-
MMBtu
|
- | - | - | - | |
11 | 2.1211: Move boiler to more efficient location | $4,387 | - | - | - |
$4,387
-
MMBtu
|
- | - | - | - | |
12 | 3.4155: Meter waste water | $4,133 | $1,500 | - | - | - |
$4,133
-
Tgal
|
- | - | - | |
13 | 4.652: Replace existing equipment with more suitable substitutes | $2,309 | $8,820 | - | - | - | - | - | - | $2,309 | |
14 | 4.432: Cross-train personnel to avoid lost time | $12,120 | $16,900 | - | - | - | - | - | - | $12,120 | |
TOTAL RECOMMENDED | $125,791 | $124,224 |
$49,657
1,057,960
kWh
|
$17,975
-
kW-mo/yr
|
$39,010
-
MMBtu
|
$4,133
-
Tgal
|
$1,259 | $(-672.0) | $14,429 | ||
TOTAL IMPLEMENTED | $63,042 | $75,712 |
$37,515
788,152
kWh
|
$15,296
-
kW-mo/yr
|
$5,511
-
MMBtu
|
$4,133
-
Tgal
|
$1,259 | $(-672.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs