ITAC Assessment: UF0291
ITAC logo
ITAC Assessment: UF0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Bottled Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range n/a
# of Employees 400
Plant Area 232,400
ft2
Annual Production 0
pieces
Production Hrs. Annual 5,720
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $411,047 9,081,344
kWh
Electricity Demand $133,756 18,439
kW-mo/yr
Natural Gas $61,540 24,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,042

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $1,755 $1,050 $406
9,023
kWh
$90
-
kW-mo/yr
- - $1,259 - -
02 2.7111: Reduce illumination to minimum necessary levels $4,427 $192 $3,627
80,592
kWh
$800
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,917 $6,752 $5,744
127,636
kWh
$1,173
-
kW-mo/yr
- - - - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $22,067 $40,280 $12,425
276,120
kWh
$10,266
-
kW-mo/yr
- - - $(-624.0) -
05 2.2135: Repair and eliminate steam leaks $1,124 $450 - - $1,124
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,424 $490 $7,472
120,518
kWh
- - - - $(-48.0) -
07 2.4133: Use most efficient type of electric motors $15,235 $25,190 $11,468
254,855
kWh
$3,767
-
kW-mo/yr
- - - - -
08 2.1243: Use heat from boiler blowdown to preheat boiler feed water $17,341 $2,600 - - $17,341
-
MMBtu
- - - -
09 2.6231: Utilize controls to operate equipment only when needed $10,394 $20,000 $8,515
189,216
kWh
$1,879
-
kW-mo/yr
- - - - -
10 2.2191: Substitute hot process fluids for steam $16,158 - - - $16,158
-
MMBtu
- - - -
11 2.1211: Move boiler to more efficient location $4,387 - - - $4,387
-
MMBtu
- - - -
12 3.4155: Meter waste water $4,133 $1,500 - - - $4,133
-
Tgal
- - -
13 4.652: Replace existing equipment with more suitable substitutes $2,309 $8,820 - - - - - - $2,309
14 4.432: Cross-train personnel to avoid lost time $12,120 $16,900 - - - - - - $12,120
TOTAL RECOMMENDED $125,791 $124,224 $49,657
1,057,960
kWh
$17,975
-
kW-mo/yr
$39,010
-
MMBtu
$4,133
-
Tgal
$1,259 $(-672.0) $14,429
TOTAL IMPLEMENTED $63,042 $75,712 $37,515
788,152
kWh
$15,296
-
kW-mo/yr
$5,511
-
MMBtu
$4,133
-
Tgal
$1,259 $(-672.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs