ITAC Assessment: UF0285
ITAC logo
ITAC Assessment: UF0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Corn and Flour Tortillas
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area 18,000
ft2
Annual Production 10,500,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,532 772,779
kWh
Electricity Demand $18,385 2,138
kW-mo/yr
Natural Gas $73,520 11,470
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.4151: Develop a repair/replace policy $1,737 $624 $1,314
25,266
kWh
$423
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,067 $1,072 $577
11,092
kWh
$490
-
kW-mo/yr
- - - - -
03 2.7145: Install skylights $2,866 $3,569 $1,679
32,291
kWh
$1,187
-
kW-mo/yr
- - - - -
04 2.2136: Install / repair insulation on steam lines $669 $101 $669
12,867
kWh
- - - - - -
05 2.2221: Use immersion heating in tanks, melting pots, etc $7,697 $25,000 $8,412
161,763
kWh
$3,210
-
kW-mo/yr
$(-3,925.0)
-
MMBtu
- - - -
06 3.4155: Meter waste water $778 $1,500 - - - $778
-
Tgal
- - -
07 4.821: Pay bills on time to avoid late fees $288 - - - - - - $288 -
08 4.114: Add/modify equipment to improve drying process $4,760 $2,000 - - - - - - $4,760
09 2.7491: Insulate glazing, walls, ceilings, and roofs $20,950 $11,700 $958
12,600
kWh
- - - $19,992 - -
TOTAL RECOMMENDED $40,812 $45,566 $13,609
255,879
kWh
$5,310
-
kW-mo/yr
$(-3,925.0)
-
MMBtu
$778
-
Tgal
$19,992 $288 $4,760
TOTAL IMPLEMENTED $27,445 $15,301 $1,627
25,467
kWh
- - $778
-
Tgal
$19,992 $288 $4,760
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs