ITAC Assessment: TN0172
ITAC logo
ITAC Assessment: TN0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product BUSINESS FORMS
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,212
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,836 1,002,345
kWh
Fuel Oil #2 $12,641 1,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,165 $3,500 - $3,165
-
MMBtu
$(-2,000.0)
02 2.6212: Turn off equipment during breaks, reduce operating time $2,755 - $2,755
68,875
kWh
- -
03 2.2511: Insulate bare equipment $1,360 $13,000 - $1,360
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,063 $700 - $1,063
-
MMBtu
-
TOTAL RECOMMENDED $6,343 $17,200 $2,755
68,875
kWh
$5,588
-
MMBtu
$(-2,000.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs