ITAC Assessment: UF0282
ITAC logo
ITAC Assessment: UF0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Mattresses
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 152,000
ft2
Annual Production 468,000
pieces
Production Hrs. Annual 5,304
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,401 2,912,960
kWh
Electricity Demand $37,169 7,013
kW-mo/yr
Natural Gas $32,558 2,789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Increase in Production Savings
01 2.8121: Apply for tax-free status for energy purchases $11,113 $50 - - $11,113 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $20,296 $28,400 $16,259
345,932
kWh
$4,037
-
kW-mo/yr
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $32,895 $49,350 $19,305
410,754
kWh
$10,494
-
kW-mo/yr
$3,096 -
04 2.4221: Install compressor air intakes in coolest locations $942 $2,000 $942
20,039
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,343 $340 $5,379
89,647
kWh
- $(-36.0) -
06 2.4323: Use optimum size and capacity equipment $6,986 $9,000 $6,986
116,438
kWh
- - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $682 $1,895 - - $682 -
08 2.7491: Insulate glazing, walls, ceilings, and roofs $78,000 $98,800 - - - $78,000
09 4.448: Install automatic part storage / retreval system $35,100 $4,494 - - $35,100 -
TOTAL RECOMMENDED $191,357 $194,329 $48,871
982,810
kWh
$14,531
-
kW-mo/yr
$49,955 $78,000
TOTAL IMPLEMENTED $58,542 $13,884 $12,365
206,085
kWh
- $46,177 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs