ITAC Assessment: UF0278
ITAC logo
ITAC Assessment: UF0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Acoustical Ceiling Tiles
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 1,132,560
ft2
Annual Production 150,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $914,469 37,784,975
kWh
Electricity Demand $658,925 71,520
kW-mo/yr
Natural Gas $2,818,245 667,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $648,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $248,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $46,074 $2,910 $21,543
797,888
kWh
$23,904
-
kW-mo/yr
- - $627
02 2.7142: Utilize higher efficiency lamps and/or ballasts $190,612 $67,472 $148,650
5,505,539
kWh
$41,962
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $703 $621 $703
15,614
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $56,760 $143,877 $41,493
1,536,765
kWh
$15,267
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $19,545 $36,000 - - - - $19,545
06 2.4226: Use / purchase optimum sized compressor $26,575 $46,800 $22,055
816,870
kWh
$4,520
-
kW-mo/yr
- - -
07 2.7212: Install or upgrade insulation on hvac distribution systems $191,133 $282,000 - - $191,133
-
MMBtu
- -
08 2.7226: Use computer programs to optimize hvac performance $5,102 $20,000 $5,102
188,963
kWh
- - - -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $682 $1,895 - - - $682
-
lb
-
10 4.431: Train operators for maximum operating efficiency $111,602 $1,600 $81,504
3,018,656
kWh
$30,098
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $648,788 $603,175 $321,050
11,880,295
kWh
$115,751
-
kW-mo/yr
$191,133
-
MMBtu
$682
-
lb
$20,172
TOTAL IMPLEMENTED $248,075 $211,970 $190,846
7,057,918
kWh
$57,229
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs