ITAC Assessment: UF0276
ITAC logo
ITAC Assessment: UF0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Pharmaceutical Intermediates
NAICS
n/a
SIC 2865: Cyclic Organic Crudes and Intermediates, and Organic Dyes and Pigments
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 100,000
ft2
Annual Production 0
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,340 988,313
kWh
Electricity Demand $31,013 3,603
kW-mo/yr
Electricity Fees $16,001 -
Natural Gas $28,468 2,641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $705 $785 $385
6,523
kWh
$320
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $516 $500 $516
6,266
kWh
- - -
03 2.4151: Develop a repair/replace policy $4,501 $8,123 $3,643
61,747
kWh
$858
-
kW-mo/yr
- -
04 4.652: Replace existing equipment with more suitable substitutes $439 $450 $439
7,437
kWh
- - -
05 2.2136: Install / repair insulation on steam lines $390 $91 - - $390
-
MMBtu
-
06 2.2121: Increase amount of condensate returned $1,194 $5,000 - - $1,194
-
MMBtu
-
07 2.8121: Apply for tax-free status for energy purchases $5,036 $50 - - - $5,036
08 2.2111: Install steam trap $14,111 $1,200 $14,111
81,973
kWh
- - -
09 3.8142: Distill contaminated solvents for reuse $21,330 $45,000 - - - $21,330
TOTAL RECOMMENDED $48,222 $61,199 $19,094
163,946
kWh
$1,178
-
kW-mo/yr
$1,584
-
MMBtu
$26,366
TOTAL IMPLEMENTED $37,590 $52,150 $15,066
95,676
kWh
- $1,194
-
MMBtu
$21,330
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs