ITAC Assessment: UF0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Mineral Sands
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 10,500
ft2
Annual Production 100,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $468,881 16,566,008
kWh
Electricity Demand $85,976 27,541
kW-mo/yr
Fuel Oil #6 $356,937 72,779
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $775 $1,200 $672
24,002
kWh
$103
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $706 $410 $748
21,993
kWh
- - - $(-42.0)
03 2.4133: Use most efficient type of electric motors $13,613 $64,742 $11,427
408,094
kWh
$2,186
-
kW-mo/yr
- - -
04 2.7131: Add area lighting switches $2,086 $2,358 $2,086
61,351
kWh
- - - -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $314 $75 $314
11,213
kWh
- - - -
06 2.2511: Insulate bare equipment $20,239 $2,500 - - $20,239
-
MMBtu
- -
07 2.4222: Install adequate dryers on air lines to eliminate blowdown $5,760 $3,985 - - - - $5,760
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $316 $1,895 - - - $316
-
lb
-
09 4.652: Replace existing equipment with more suitable substitutes $10,697 - $9,668
345,301
kWh
- - - $1,029
10 4.652: Replace existing equipment with more suitable substitutes $777 $525 $128
4,555
kWh
$19
-
kW-mo/yr
- - $630
TOTAL RECOMMENDED $55,283 $77,690 $25,043
876,509
kWh
$2,308
-
kW-mo/yr
$20,239
-
MMBtu
$316
-
lb
$7,377
TOTAL IMPLEMENTED $43,809 $77,165 $15,247
526,653
kWh
$2,289
-
kW-mo/yr
$20,239
-
MMBtu
$316
-
lb
$5,718
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs