ITAC Assessment: UF0259
ITAC logo
ITAC Assessment: UF0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Water Meters
NAICS
n/a
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 90,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,178 2,373,095
kWh
Electricity Demand $41,686 7,006
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,382

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,865 $2,831 $5,061
81,770
kWh
$804
-
kW-mo/yr
- -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $5,242 $12,014 $5,242
65,651
kWh
- - -
03 2.4133: Use most efficient type of electric motors $1,732 $7,400 $1,204
19,343
kWh
$528
-
kW-mo/yr
- -
04 2.8121: Apply for tax-free status for energy purchases $10,323 $50 - - $10,323 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,597 $460 $2,645
33,118
kWh
- $(-48.0) -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,740 - $2,740
34,291
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $835 $1,500 $835
13,482
kWh
- - -
08 2.7135: Install occupancy sensors $481 $834 $481
7,620
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $704 $600 $230
3,810
kWh
$30
-
kW-mo/yr
$444 -
10 3.4155: Meter waste water $2,940 $1,500 - - $2,940 -
11 4.611: Begin a practice of predictive / preventative maintenance $1,874 $3,721 - - $1,874 -
12 4.711: Initiate a total quality management program $67,200 $84,000 - - - $67,200
TOTAL RECOMMENDED $102,533 $114,910 $18,438
259,085
kWh
$1,362
-
kW-mo/yr
$15,533 $67,200
TOTAL IMPLEMENTED $27,382 $13,675 $12,361
179,952
kWh
$1,362
-
kW-mo/yr
$13,659 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs