ITAC Assessment: UF0233
ITAC logo
ITAC Assessment: UF0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Extruded aluminum
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 470
Plant Area 470,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,635 18,954,400
kWh
Electricity Demand $376,529 40,689
kW-mo/yr
LPG $10,556 2,340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,146 $20,484 $5,023
535,463
kWh
$3,123
-
kW-mo/yr
- -
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,008 $750 $1,008
107,562
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,649 $320 $1,649
188,746
kWh
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $7,433 $3,905 $3,110
331,770
kWh
$4,323
-
kW-mo/yr
- -
05 3.3122: Use filtration, centrifuging to remove contaminants $10,287 $14,925 - - $10,287
-
MMBtu
-
06 4.211: Consider use / purchase of bulk materials where possible $33,600 - - - - $33,600
07 4.652: Replace existing equipment with more suitable substitutes $225 $210 $90
6,741
kWh
$105
-
kW-mo/yr
- $30
TOTAL RECOMMENDED $62,348 $40,594 $10,880
1,170,282
kWh
$7,551
-
kW-mo/yr
$10,287
-
MMBtu
$33,630
TOTAL IMPLEMENTED $46,544 $15,995 $2,657
296,308
kWh
- $10,287
-
MMBtu
$33,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs