Assessment Year | 1999 |
---|---|
Principal Product | Extruded aluminum |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $50 M to 100M |
# of Employees | 470 |
Plant Area |
470,000
ft2
|
Annual Production | 36,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $614,635 | 18,954,400 |
kWh
|
$0.032 |
Electricity Demand | $376,529 | 40,689 |
kW-mo/yr
|
$9.25 |
LPG | $10,556 | 2,340 |
MMBtu
|
$4.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,348 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,544 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,146 | $20,484 |
$5,023
535,463
kWh
|
$3,123
-
kW-mo/yr
|
- | - | |
02 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,008 | $750 |
$1,008
107,562
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,649 | $320 |
$1,649
188,746
kWh
|
- | - | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $7,433 | $3,905 |
$3,110
331,770
kWh
|
$4,323
-
kW-mo/yr
|
- | - | |
05 | 3.3122: Use filtration, centrifuging to remove contaminants | $10,287 | $14,925 | - | - |
$10,287
-
MMBtu
|
- | |
06 | 4.211: Consider use / purchase of bulk materials where possible | $33,600 | - | - | - | - | $33,600 | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $225 | $210 |
$90
6,741
kWh
|
$105
-
kW-mo/yr
|
- | $30 | |
TOTAL RECOMMENDED | $62,348 | $40,594 |
$10,880
1,170,282
kWh
|
$7,551
-
kW-mo/yr
|
$10,287
-
MMBtu
|
$33,630 | ||
TOTAL IMPLEMENTED | $46,544 | $15,995 |
$2,657
296,308
kWh
|
- |
$10,287
-
MMBtu
|
$33,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs