ITAC Assessment: UF0232
ITAC logo
ITAC Assessment: UF0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 193,000
ft2
Annual Production 700,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $504,065 13,771,981
kWh
Electricity Demand $220,830 28,277
kW-mo/yr
Electricity Fees $105,348 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $514,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $192,386 $82,242 $313,544
7,126,905
kWh
$74,570
-
kW-mo/yr
$(-195,728.0)
-
MMBtu
- - -
02 2.7111: Reduce illumination to minimum necessary levels $8,006 $60 $6,427
145,955
kWh
$1,579
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $5,521 $1,500 $5,521
125,440
kWh
- - - - -
04 2.7135: Install occupancy sensors $1,539 $834 $1,539
34,877
kWh
- - - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $3,215 - $1,078
24,619
kWh
$2,137
-
kW-mo/yr
- - - -
06 3.1163: Use plastic pallets instead of wood $25,200 $14,070 - - - $25,200
-
lb
- -
07 4.441: Install automatic packing equipment $262,532 $850,000 - - - - $262,532 -
08 4.125: $15,848 $75,000 - - - - - $15,848
TOTAL RECOMMENDED $514,247 $1,023,706 $328,109
7,457,796
kWh
$78,286
-
kW-mo/yr
$(-195,728.0)
-
MMBtu
$25,200
-
lb
$262,532 $15,848
TOTAL IMPLEMENTED $59,329 $91,464 $14,565
330,891
kWh
$3,716
-
kW-mo/yr
- $25,200
-
lb
- $15,848
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs