ITAC Assessment: ME0278
ITAC logo
ITAC Assessment: ME0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product cassettes
NAICS
n/a
SIC 3695: Magnetic And Optical Recording Media
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 105,000
ft2
Annual Production 70,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,497 13,874,854
kWh
Electricity Demand $192,453 31,430
kW-mo/yr
Electricity Fees $(-80,622.0) -
LPG $2,210 145
MMBtu
Fuel Oil #2 $12,809 2,789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,390 $39,936 n/a $11,188
279,894
kWh
$3,202
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,953 $100 n/a $5,953
148,886
kWh
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $5,910 $450 n/a $5,910
147,714
kWh
- - - - - -
04 4.821: Pay bills on time to avoid late fees $5,835 - n/a - - - - - $5,835 -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,411 $2,247 n/a $2,579
64,478
kWh
$3,672
-
kW-mo/yr
$(-2,840.0)
-
MMBtu
- - - -
06 4.652: Replace existing equipment with more suitable substitutes $3,237 $9,562 n/a - - - $3,237
-
MMBtu
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,859 $100 n/a $2,859
71,512
kWh
- - - - - -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $2,680 $3,920 n/a $2,680
67,116
kWh
- - - - - -
09 2.4133: Use most efficient type of electric motors $2,522 $5,068 n/a $2,085
52,462
kWh
$437
-
kW-mo/yr
- - - - -
10 2.8121: Apply for tax-free status for energy purchases $1,892 - n/a - - - - - $1,892 -
11 2.8121: Apply for tax-free status for energy purchases $163 - n/a - - - - - $163 -
12 3.4154: Eliminate leaks in water lines and valves $250 $100 n/a - - - - $108
-
Tgal
- $142
-
Tgal
TOTAL RECOMMENDED $49,102 $61,483 $33,254
832,062
kWh
$7,311
-
kW-mo/yr
$(-2,840.0)
-
MMBtu
$3,237
-
MMBtu
$108
-
Tgal
$7,890 $142
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs