ITAC Assessment: UF0227
ITAC logo
ITAC Assessment: UF0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Portion Controlled meat
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 18,000
ft2
Annual Production 400,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,743 906,800
kWh
Electricity Demand $18,073 1,910
kW-mo/yr
Natural Gas $960 1,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2515: Use optimum thickness insulation $7,828 - $7,828
105,803
kWh
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $2,822 - $2,822
38,101
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $4,143 - - $4,143 -
04 4.514: Re-arrange equipment layout to reduce handling costs $5,616 - - - $5,616
05 4.652: Replace existing equipment with more suitable substitutes $10,920 - - - $10,920
06 4.445: Install equipment to move product $4,493 - - - $4,493
TOTAL RECOMMENDED $35,822 - $10,650
143,904
kWh
$4,143 $21,029
TOTAL IMPLEMENTED $12,581 - $2,822
38,101
kWh
$4,143 $5,616
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs