ITAC Assessment: UF0197
ITAC logo
ITAC Assessment: UF0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product bagged ice
NAICS
n/a
SIC 2097: Manufactured Ice
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 41,800
ft2
Annual Production 7,900,000
pieces
Production Hrs. Annual 3,270
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,720 4,194,607
kWh
Electricity Demand $45,610 8,359
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,885 $3,682 $4,662
84,701
kWh
$223
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,334 $1,200 $1,334
24,326
kWh
- - -
03 2.2624: Use cold waste water to cool chiller feed water $15,069 $63,950 $13,857
252,052
kWh
$1,212
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $1,594 $15,614 $1,299
23,740
kWh
$295
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,990 $1,150 $1,990
36,049
kWh
- - -
06 4.422: Utilize outside contracting $108 - - - $108
-
lb
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,315 $7,000 - - - $5,315
08 2.8121: Apply for tax-free status for energy purchases $17,143 $1,005 - - - $17,143
09 4.441: Install automatic packing equipment $64,930 $280,000 - - - $64,930
TOTAL RECOMMENDED $112,368 $373,601 $23,142
420,868
kWh
$1,730
-
kW-mo/yr
$108
-
lb
$87,388
TOTAL IMPLEMENTED $4,918 $17,964 $4,623
84,115
kWh
$295
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs