Assessment Year | 1998 |
---|---|
Principal Product | bagged ice |
NAICS |
n/a
|
SIC | 2097: Manufactured Ice |
Sales Range | $1 M to 5M |
# of Employees | 38 |
Plant Area |
41,800
ft2
|
Annual Production | 7,900,000
pieces
|
Production Hrs. Annual | 3,270
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $228,720 | 4,194,607 |
kWh
|
$0.055 |
Electricity Demand | $45,610 | 8,359 |
kW-mo/yr
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,368 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,918 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,885 | $3,682 |
$4,662
84,701
kWh
|
$223
-
kW-mo/yr
|
- | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,334 | $1,200 |
$1,334
24,326
kWh
|
- | - | - | |
03 | 2.2624: Use cold waste water to cool chiller feed water | $15,069 | $63,950 |
$13,857
252,052
kWh
|
$1,212
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,594 | $15,614 |
$1,299
23,740
kWh
|
$295
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,990 | $1,150 |
$1,990
36,049
kWh
|
- | - | - | |
06 | 4.422: Utilize outside contracting | $108 | - | - | - |
$108
-
lb
|
- | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,315 | $7,000 | - | - | - | $5,315 | |
08 | 2.8121: Apply for tax-free status for energy purchases | $17,143 | $1,005 | - | - | - | $17,143 | |
09 | 4.441: Install automatic packing equipment | $64,930 | $280,000 | - | - | - | $64,930 | |
TOTAL RECOMMENDED | $112,368 | $373,601 |
$23,142
420,868
kWh
|
$1,730
-
kW-mo/yr
|
$108
-
lb
|
$87,388 | ||
TOTAL IMPLEMENTED | $4,918 | $17,964 |
$4,623
84,115
kWh
|
$295
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs