ITAC Assessment: UF0195
ITAC logo
ITAC Assessment: UF0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Precious metal processing
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 32
Plant Area 25,000
ft2
Annual Production 81,250
lb
Production Hrs. Annual 2,750
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,385 614,009
kWh
Electricity Demand $31,624 3,288
kW-mo/yr
Natural Gas $46,447 6,175
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $1,128 $474 $1,128
21,688
kWh
- -
02 2.7134: Use photocell controls $466 $1,260 $466
9,086
kWh
- -
03 2.4224: Upgrade controls on compressors $750 $60 $82
1,465
kWh
$334
-
kW-mo/yr
$334
04 2.4133: Use most efficient type of electric motors $249 $1,716 $144
2,638
kWh
$105
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $614 $53 $345
6,741
kWh
$269
-
kW-mo/yr
-
06 3.1192: Reduce scrap production $186 $1,400 $108
2,052
kWh
$31
-
kW-mo/yr
$47
07 2.3191: Use demand controller or load shedder $7,846 $811 - $7,846
-
kW-mo/yr
-
08 2.7314: Reduce ventilation air $2,283 $2,700 $1,280
24,619
kWh
$1,003
-
kW-mo/yr
-
09 3.5248: Separate and recycle scrap metal to foundry or for sale $720 - - - $720
10 3.1192: Reduce scrap production $587 - - - $587
11 2.8121: Apply for tax-free status for energy purchases $2,027 $750 - - $2,027
12 4.652: Replace existing equipment with more suitable substitutes $10,296 $1,677 - - $10,296
13 3.2176: Increase use of automation $20,000 $10 - - $20,000
TOTAL RECOMMENDED $47,152 $10,911 $3,553
68,289
kWh
$9,588
-
kW-mo/yr
$34,011
TOTAL IMPLEMENTED $45,951 $10,858 $3,208
61,548
kWh
$9,319
-
kW-mo/yr
$33,424
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs