ITAC Assessment: HO0173
ITAC logo
ITAC Assessment: HO0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Electrical Products
NAICS
n/a
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 35,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,217 804,513
kWh
Electricity Demand $30,074 3,452
kW-mo/yr
Electricity Fees $4,869 -
Natural Gas $44,787 8,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,124 $17,821 $3,825
45,135
kWh
$2,299
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,250 $1,569 $784
9,379
kWh
$466
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $3,033 $120 $1,904
22,274
kWh
$1,129
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $2,983 $600 $2,983
35,170
kWh
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $648 $1,073 - - $648
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $492 $1,214 - - $492
-
MMBtu
-
07 4.211: Consider use / purchase of bulk materials where possible $4,478 $500 - - - $4,478
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $19,788 $500 - $19,788
-
kW-mo/yr
- -
09 2.3191: Use demand controller or load shedder $1,463 - - $1,463
-
kW-mo/yr
- -
TOTAL RECOMMENDED $40,259 $23,397 $9,496
111,958
kWh
$25,145
-
kW-mo/yr
$1,140
-
MMBtu
$4,478
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs