ITAC Assessment: SD0598
ITAC logo
ITAC Assessment: SD0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product fabricated metal parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area 16,000
ft2
Annual Production 13,500
units
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,642 406,600
kWh
Electricity Demand $43,664 1,823
kW-mo/yr
TOTAL YEARLY COSTS $76,306
RECOMMENDED SAVINGS* $3,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,874 $2,784 $986
12,295
kWh
$833
-
kW-mo/yr
$55
02 2.7135: Install occupancy sensors $868 $693 $868
10,812
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $688 $150 $484
6,023
kWh
$204
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $243 - $243
3,020
kWh
- -
TOTAL RECOMMENDED $3,673 $3,627 $2,581
32,150
kWh
$1,037
-
kW-mo/yr
$55
TOTAL IMPLEMENTED $931 $150 $727
9,043
kWh
$204
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs