ITAC Assessment: UF0189
ITAC logo
ITAC Assessment: UF0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Mainframe computer power supplies
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 245
Plant Area 32,350
ft2
Annual Production 60,512
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,293 3,075,322
kWh
Electricity Demand $61,237 6,900
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,522,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,465,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7111: Reduce illumination to minimum necessary levels $7,371 $315 $6,028
140,094
kWh
$1,343
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $6,181 $4,416 $6,181
143,611
kWh
- - - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $425 $800 $425
9,965
kWh
- - - -
04 2.7232: Replace existing hvac unit with high efficiency model $18,074 $74,230 $12,943
300,996
kWh
$5,131
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $904 $700 $904
21,102
kWh
- - - -
06 3.5311: Recover and reuse waste material $3,500 $1,000 - - - $3,500 -
07 3.5311: Recover and reuse waste material $25,456 - - - $1,000
-
lb
$24,456 -
08 2.8121: Apply for tax-free status for energy purchases $9,950 $750 - - - $9,950 -
09 4.421: Modify current incentive program $600,000 $15,000 - - - - $600,000
10 4.322: Eliminate old stock and modify inventory control $850,769 $87,000 - - - $730,769 $120,000
TOTAL RECOMMENDED $1,522,630 $184,211 $26,481
615,768
kWh
$6,474
-
kW-mo/yr
$1,000
-
lb
$768,675 $720,000
TOTAL IMPLEMENTED $1,465,123 $104,450 $904
21,102
kWh
- - $744,219 $720,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs