ITAC Assessment: UF0184
ITAC logo
ITAC Assessment: UF0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Vegetable Concentrates
NAICS
n/a
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 45,000
ft2
Annual Production 20,000
ton
Production Hrs. Annual 4,784
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,113 1,277,550
kWh
Electricity Demand $17,015 4,616
kW-mo/yr
Natural Gas $138,779 23,733
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $5,816 $15,515 - - $5,816
-
MMBtu
- -
02 2.4133: Use most efficient type of electric motors $252 $252 $199
3,517
kWh
$53
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,782 $1,000 - - $1,782
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $2,851 $451 - - $2,851
-
MMBtu
- -
05 2.2511: Insulate bare equipment $1,170 $974 $1,170
20,223
kWh
- - - -
06 2.2123: Insulate feedwater tank $1,304 $200 - - $1,304
-
MMBtu
- -
07 3.1291: Eliminate practice of mixing waste streams $1,261 $5,000 - - - - $1,261
08 3.6192: Use a less expensive method of waste removal $3,613 - - - - $3,613
-
lb
-
09 4.213: Purchase material from supplier in customized packaging $4,655 $1,800 - - - - $4,655
10 4.231: Purchase equipment instead of leasing $12,450 $15,000 - - - - $12,450
11 2.8121: Apply for tax-free status for energy purchases $2,628 - - - - - $2,628
TOTAL RECOMMENDED $37,782 $40,192 $1,369
23,740
kWh
$53
-
kW-mo/yr
$11,753
-
MMBtu
$3,613
-
lb
$20,994
TOTAL IMPLEMENTED $19,809 $17,877 $1,369
23,740
kWh
$53
-
kW-mo/yr
$5,937
-
MMBtu
- $12,450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs