Assessment Year | 2023 |
---|---|
Principal Product | Assembly Lines |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
380,000
ft2
|
Annual Production | 726,966
pieces
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $256,048 | 4,707,032 |
kWh
|
$0.054 |
Electricity Demand | $252,864 | 10,700 |
kW-mo/yr
|
$23.63 |
Electricity Fees | $744 | - |
|
- |
Natural Gas | $266,704 | 25,170 |
MMBtu
|
$10.60 |
TOTAL YEARLY COSTS | $776,360 | |||
RECOMMENDED SAVINGS* | $407,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $263,985 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,416 | $480 |
$1,651
33,019
kWh
|
$1,765
-
kW-mo/yr
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $132,126 | - |
$59,932
1,198,649
kWh
|
$72,194
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $517 | $162 |
$517
10,333
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $127,926 | $136,639 |
$58,023
1,160,461
kWh
|
$69,903
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $504 | $1,459 |
$475
9,504
kWh
|
$29
-
kW-mo/yr
|
- | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $50,220 | $250,000 |
$(-14,349.0)
(-286,981)
kWh
|
- |
$64,569
-
MMBtu
|
- | |
07 | 2.7444: Close holes and openings in building such as broken windows | $7,452 | $496 |
$2,327
46,538
kWh
|
- |
$5,125
-
MMBtu
|
- | |
08 | 2.7444: Close holes and openings in building such as broken windows | $406 | $50 |
$124
2,482
kWh
|
- |
$282
-
MMBtu
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $83,300 | $13,599 |
$(-106.0)
(-2,127)
kWh
|
- |
$83,406
-
MMBtu
|
- | |
10 | 2.8114: Change rate schedules or other changes in utility service | $1,154 | - | - | - | - | $1,154 | |
TOTAL RECOMMENDED | $407,021 | $402,885 |
$108,594
2,171,878
kWh
|
$143,891
-
kW-mo/yr
|
$153,382
-
MMBtu
|
$1,154 | ||
TOTAL IMPLEMENTED | $263,985 | $137,281 |
$120,123
2,402,462
kWh
|
$143,862
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs