ITAC Assessment: UF0177
ITAC logo
ITAC Assessment: UF0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Doughnuts
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area 7,800
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,721 647,421
kWh
Electricity Demand $12,040 1,378
kW-mo/yr
Natural Gas $22,885 3,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,139 $2,865 $1,765
36,049
kWh
$374
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $82 $82 $56
1,172
kWh
$26
-
kW-mo/yr
- - - -
03 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $152 $680 $38
879
kWh
- $114
-
MMBtu
- - -
04 2.7261: Install timers and/or thermostats $221 $200 $221
4,396
kWh
- - - - -
05 2.2437: Recover waste heat from equipment $2,415 $4,600 $1,975
40,445
kWh
$440
-
kW-mo/yr
- - - -
06 3.4116: Meter recycled water (to reduce sewer charges) $1,392 $1,300 - - - $1,392
-
Tgal
- -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,238 - - - - - $(-720.0) $3,958
08 2.8121: Apply for tax-free status for energy purchases $1,450 - - - - - $1,450 -
TOTAL RECOMMENDED $11,089 $9,727 $4,055
82,941
kWh
$840
-
kW-mo/yr
$114
-
MMBtu
$1,392
-
Tgal
$730 $3,958
TOTAL IMPLEMENTED $3,145 $1,582 $277
5,568
kWh
$26
-
kW-mo/yr
- $1,392
-
Tgal
$1,450 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs