ITAC Assessment: UF0170
ITAC logo
ITAC Assessment: UF0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Mobile Homes
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 1,336
pieces
Production Hrs. Annual 3,300
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,037 1,479,484
kWh
Electricity Demand $49,374 5,720
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,266 $620 $791
15,240
kWh
$475
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $481 $882 $270
5,275
kWh
$211
-
kW-mo/yr
- - - - -
03 2.7232: Replace existing hvac unit with high efficiency model $2,872 $1,507 $1,943
37,222
kWh
$929
-
kW-mo/yr
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,735 $1,550 $4,735
92,907
kWh
- - - - - -
05 2.4226: Use / purchase optimum sized compressor $5,054 - - $5,054
-
kW-mo/yr
- - - - -
06 3.4116: Meter recycled water (to reduce sewer charges) $640 $894 - - - - - $640 -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $6,879 $18,400 - - $4,200
-
lb
- - - $2,679
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $21,041 $5,500 $(-262.0)
(-4,982)
kWh
- - $(-9,945.0) - $31,248 -
09 3.1191: Change procedures / equipment / operating conditions $3,438 $25 - - - - $3,438 - -
10 4.425: Eliminate/reduce redundant inspections $5,666 - - - - $5,666 - - -
11 4.431: Train operators for maximum operating efficiency $18,237 $3,120 - - - $13,600 - $4,637 -
12 4.421: Modify current incentive program $32,000 $50,000 - - - $32,000 - - -
TOTAL RECOMMENDED $102,309 $82,498 $7,477
145,662
kWh
$6,669
-
kW-mo/yr
$4,200
-
lb
$41,321 $3,438 $36,525 $2,679
TOTAL IMPLEMENTED $71,524 $76,079 $7,739
150,644
kWh
$6,669
-
kW-mo/yr
$4,200
-
lb
$45,600 - $4,637 $2,679
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs