Assessment Year | 1997 |
---|---|
Principal Product | Mobile Homes |
NAICS |
n/a
|
SIC | 2451: Mobile Homes |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
70,000
ft2
|
Annual Production | 1,336
pieces
|
Production Hrs. Annual | 3,300
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,037 | 1,479,484 |
kWh
|
$0.052 |
Electricity Demand | $49,374 | 5,720 |
kW-mo/yr
|
$8.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $102,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $71,524 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,266 | $620 |
$791
15,240
kWh
|
$475
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $481 | $882 |
$270
5,275
kWh
|
$211
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $2,872 | $1,507 |
$1,943
37,222
kWh
|
$929
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,735 | $1,550 |
$4,735
92,907
kWh
|
- | - | - | - | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $5,054 | - | - |
$5,054
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $640 | $894 | - | - | - | - | - | $640 | - | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $6,879 | $18,400 | - | - |
$4,200
-
lb
|
- | - | - | $2,679 | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $21,041 | $5,500 |
$(-262.0)
(-4,982)
kWh
|
- | - | $(-9,945.0) | - | $31,248 | - | |
09 | 3.1191: Change procedures / equipment / operating conditions | $3,438 | $25 | - | - | - | - | $3,438 | - | - | |
10 | 4.425: Eliminate/reduce redundant inspections | $5,666 | - | - | - | - | $5,666 | - | - | - | |
11 | 4.431: Train operators for maximum operating efficiency | $18,237 | $3,120 | - | - | - | $13,600 | - | $4,637 | - | |
12 | 4.421: Modify current incentive program | $32,000 | $50,000 | - | - | - | $32,000 | - | - | - | |
TOTAL RECOMMENDED | $102,309 | $82,498 |
$7,477
145,662
kWh
|
$6,669
-
kW-mo/yr
|
$4,200
-
lb
|
$41,321 | $3,438 | $36,525 | $2,679 | ||
TOTAL IMPLEMENTED | $71,524 | $76,079 |
$7,739
150,644
kWh
|
$6,669
-
kW-mo/yr
|
$4,200
-
lb
|
$45,600 | - | $4,637 | $2,679 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs