ITAC Assessment: UF0168
ITAC logo
ITAC Assessment: UF0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Frozen Food
NAICS
n/a
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,282 3,577,667
kWh
Electricity Demand $95,784 8,020
kW-mo/yr
Natural Gas $10,294 13,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $531,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,489 $20,613 $3,705
109,027
kWh
$3,784
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $414 $426 $246
7,327
kWh
$168
-
kW-mo/yr
- - - -
03 2.4239: Eliminate or reduce compressed air usage $3,842 $8,000 $1,372
40,445
kWh
$2,470
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,062 $1,350 $2,062
33,705
kWh
- - - - -
05 2.2437: Recover waste heat from equipment $3,369 $750 - - $3,369
-
MMBtu
- - -
06 2.2615: Clean condenser tubes $5,814 - $5,814
228,019
kWh
- - - - -
07 4.231: Purchase equipment instead of leasing $482,839 $1,600,000 - - - - $482,839 -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $2,296 $7,000 - - - $2,296
-
lb
- -
09 3.1191: Change procedures / equipment / operating conditions $23,400 - - - - - - $23,400
TOTAL RECOMMENDED $531,525 $1,638,139 $13,199
418,523
kWh
$6,422
-
kW-mo/yr
$3,369
-
MMBtu
$2,296
-
lb
$482,839 $23,400
TOTAL IMPLEMENTED $18,075 $29,389 $11,827
378,078
kWh
$3,952
-
kW-mo/yr
- $2,296
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs