Assessment Year | 1996 |
---|---|
Principal Product | Metal Clad Building Panels |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
235,000
ft2
|
Annual Production | 12,000
thousand feet
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,486 | 1,939,332 |
kWh
|
$0.055 |
Electricity Demand | $26,941 | 5,736 |
kW-mo/yr
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,052 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,052 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7132: Install timers on light switches in little used areas | $4,760 | $860 |
$4,760
86,460
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,464 | $853 |
$1,853
33,705
kWh
|
$611
-
kW-mo/yr
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $6,362 | $1,600 |
$6,362
92,321
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,264 | $1,300 |
$5,264
76,202
kWh
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $10,500 | $10,500 |
$10,500
188,746
kWh
|
- | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $902 | $120 |
$596
10,844
kWh
|
$306
-
kW-mo/yr
|
- | |
07 | 3.5316: Contract a wood pallet recycling company | $32,800 | - | - | - |
$32,800
-
lb
|
|
TOTAL RECOMMENDED | $63,052 | $15,233 |
$29,335
488,278
kWh
|
$917
-
kW-mo/yr
|
$32,800
-
lb
|
||
TOTAL IMPLEMENTED | $63,052 | $15,233 |
$29,335
488,278
kWh
|
$917
-
kW-mo/yr
|
$32,800
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs