| Assessment Year | 1995 |
|---|---|
| Principal Product | Eelctroplated Plastic Moldings |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 26 |
| Plant Area |
31,200
ft2
|
| Annual Production | 5,200,000
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $96,554 | 1,483,294 |
kWh
|
$0.065 |
| Natural Gas | $47,499 | 7,920 |
MMBtu
|
$6.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $84,187 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $1,947 | $1,500 |
$1,947
42,204
kWh
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,929 | $1,727 |
$1,929
30,188
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,778 | $17,592 |
$16,778
364,889
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,379 | $350 |
$7,379
113,423
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,059 | $846 |
$1,059
13,775
kWh
|
- | - | |
| 06 | 3.6112: Use filter and drying oven to reduce sludge volume | $23,780 | $15,700 |
$(-343.0)
(-2,931)
kWh
|
$24,123
-
lb
|
- | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $31,315 | $4,200 |
$2,815
61,254
kWh
|
- | $28,500 | |
| TOTAL RECOMMENDED | $84,187 | $41,915 |
$31,564
622,802
kWh
|
$24,123
-
lb
|
$28,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs