ITAC Assessment: UD0348
ITAC logo
ITAC Assessment: UD0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MILK,WATER,BUTTER,CHEESE
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 165
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,300
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $353,700 6,201,055
kWh
Natural Gas $88,561 25,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,946

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $5,557 $5,000 $5,557
-
kWh
-
02 2.3212: Optimize plant power factor $1,543 $1,500 $1,543
-
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $8,159 $10,000 $7,965
102,579
kWh
$194
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $23,107 $100,000 $23,107
133,646
kWh
-
05 2.8114: Change rate schedules or other changes in utility service $5,580 $35,000 $5,580
-
kWh
-
TOTAL RECOMMENDED $43,946 $151,500 $43,752
236,225
kWh
$194
-
MMBtu
TOTAL IMPLEMENTED $43,946 $151,500 $43,752
236,225
kWh
$194
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs