ITAC Assessment: UF0120
ITAC logo
ITAC Assessment: UF0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Supermarket Equipment
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 250,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 3,276
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,968 4,050,410
kWh
Natural Gas $16,589 2,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,595 $54,918 $25,595
213,365
kWh
-
02 2.4133: Use most efficient type of electric motors $730 $4,270 $730
6,448
kWh
-
03 2.7271: Replace electric reheat with heat pipes $2,103 $3,500 $2,103
22,274
kWh
-
04 2.7132: Install timers on light switches in little used areas $1,769 $520 $1,769
18,757
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,217 $850 $6,217
56,565
kWh
-
06 2.4225: Install common header on compressors $3,282 $2,500 $3,282
34,877
kWh
-
07 2.2437: Recover waste heat from equipment $2,241 $5,000 - $2,241
-
MMBtu
TOTAL RECOMMENDED $41,937 $71,558 $39,696
352,286
kWh
$2,241
-
MMBtu
TOTAL IMPLEMENTED $32,542 $60,038 $32,542
276,378
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs