ITAC Assessment: UD0308
ITAC logo
ITAC Assessment: UD0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BURIAL CASKETS
NAICS
n/a
SIC 3995: Burial Caskets
Sales Range $100
M
to 500
M
# of Employees 487
Plant Area
n/a
Annual Production 209,000
pieces
Production Hrs. Annual 4,300
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $617,102 14,760,551
kWh
Natural Gas $404,702 138,461
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4156: Use flow control valves on equipment to optimize water use $13,703 $1,500 - - $13,703
02 3.4113: Treat and reuse rinse waters $5,588 $2,000 - - $5,588
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,831 - $6,831
-
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $2,904 $900 $3,036
100,821
kWh
$(-687.0)
-
MMBtu
$555
05 2.7142: Utilize higher efficiency lamps and/or ballasts $861 $1,050 $912
18,464
kWh
$(-126.0)
-
MMBtu
$75
TOTAL RECOMMENDED $29,887 $5,450 $10,779
119,285
kWh
$(-813.0)
-
MMBtu
$19,921
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs