Assessment Year | 1990 |
---|---|
Principal Product | BURIAL CASKETS |
NAICS |
n/a
|
SIC | 3995: Burial Caskets |
Sales Range | $100 M to 500M |
# of Employees | 487 |
Plant Area |
n/a
|
Annual Production | 209,000
pieces
|
Production Hrs. Annual | 4,300
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $617,102 | 14,760,551 |
kWh
|
$0.042 |
Natural Gas | $404,702 | 138,461 |
MMBtu
|
$2.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,887 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.4156: Use flow control valves on equipment to optimize water use | $13,703 | $1,500 | - | - | $13,703 | |
02 | 3.4113: Treat and reuse rinse waters | $5,588 | $2,000 | - | - | $5,588 | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,831 | - |
$6,831
-
kWh
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,904 | $900 |
$3,036
100,821
kWh
|
$(-687.0)
-
MMBtu
|
$555 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $861 | $1,050 |
$912
18,464
kWh
|
$(-126.0)
-
MMBtu
|
$75 | |
TOTAL RECOMMENDED | $29,887 | $5,450 |
$10,779
119,285
kWh
|
$(-813.0)
-
MMBtu
|
$19,921 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs