ITAC Assessment: UF0087
ITAC logo
ITAC Assessment: UF0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Truck Trailers
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area 280,000
ft2
Annual Production 4,200
pieces
Production Hrs. Annual 7,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,567 5,073,857
kWh
Natural Gas $9,000 1,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,505 $10,109 $13,505
235,639
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $229 $360 $229
2,931
kWh
-
03 2.4133: Use most efficient type of electric motors $6,723 $7,946 $6,723
108,441
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $170 $300 $170
2,931
kWh
-
05 2.2437: Recover waste heat from equipment $5,382 $2,000 - $5,382
-
MMBtu
06 2.6231: Utilize controls to operate equipment only when needed $11,641 $1,500 $11,641
187,866
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,625 $800 $5,625
90,856
kWh
-
08 2.8114: Change rate schedules or other changes in utility service $39,992 $225,000 $39,992
-
kWh
-
TOTAL RECOMMENDED $83,267 $248,015 $77,885
628,664
kWh
$5,382
-
MMBtu
TOTAL IMPLEMENTED $66,244 $244,515 $66,244
440,798
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs