| Assessment Year | 1994 |
|---|---|
| Principal Product | Truck Trailers |
| NAICS |
n/a
|
| SIC | 3792: Travel Trailers and Campers |
| Sales Range | $10 M to 50M |
| # of Employees | 420 |
| Plant Area |
280,000
ft2
|
| Annual Production | 4,200
pieces
|
| Production Hrs. Annual | 7,400
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $312,567 | 5,073,857 |
kWh
|
$0.062 |
| Natural Gas | $9,000 | 1,354 |
MMBtu
|
$6.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $83,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $66,244 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,505 | $10,109 |
$13,505
235,639
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $229 | $360 |
$229
2,931
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $6,723 | $7,946 |
$6,723
108,441
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $170 | $300 |
$170
2,931
kWh
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $5,382 | $2,000 | - |
$5,382
-
MMBtu
|
|
| 06 | 2.6231: Utilize controls to operate equipment only when needed | $11,641 | $1,500 |
$11,641
187,866
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,625 | $800 |
$5,625
90,856
kWh
|
- | |
| 08 | 2.8114: Change rate schedules or other changes in utility service | $39,992 | $225,000 |
$39,992
-
kWh
|
- | |
| TOTAL RECOMMENDED | $83,267 | $248,015 |
$77,885
628,664
kWh
|
$5,382
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $66,244 | $244,515 |
$66,244
440,798
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs