Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fiberglass Building Insulation Material
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $50
M
to 100
M
# of Employees 366
Plant Area 606,900
ft2
Annual Production 70,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,294,130 105,765,242
kWh
Natural Gas $549,507 177,578
MMBtu
LPG $19,757 1,918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $979,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $24,584 $57,981 $24,584
-
kWh
-
02 2.4133: Use most efficient type of electric motors $39,338 $33,934 $39,338
777,550
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,487 $6,576 $3,487
68,875
kWh
-
04 2.7135: Install occupancy sensors $5,124 $854 $5,124
101,407
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $35,685 $100,000 - $35,685
-
MMBtu
06 2.4239: Eliminate or reduce compressed air usage $16,290 - $16,290
322,098
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $55,136 $55,428 $55,136
1,089,683
kWh
-
08 2.4239: Eliminate or reduce compressed air usage $6,496 - $6,496
127,784
kWh
-
09 2.4322: Use or replace with energy efficient substitutes $793,437 $1,350,000 $1,084,346
21,429,660
kWh
$(-290,909.0)
-
MMBtu
TOTAL RECOMMENDED $979,577 $1,604,773 $1,234,801
23,917,057
kWh
$(-255,224.0)
-
MMBtu
TOTAL IMPLEMENTED $88,823 $99,345 $88,823
1,269,930
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs