ITAC Assessment: UF0084
ITAC logo
ITAC Assessment: UF0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 227,000
ft2
Annual Production 57,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,271 6,259,965
kWh
Natural Gas $81,127 13,677
MMBtu
Fuel Oil #2 $139,721 45,391
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $397,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,723

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,227 $20,158 $12,227
214,537
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $906 $1,764 $906
17,292
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $256 $360 $256
2,931
kWh
- - -
04 2.4133: Use most efficient type of electric motors $18,485 $9,481 $18,485
324,443
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,645 $1,725 $3,645
63,892
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,113 $6,574 $9,113
159,730
kWh
- - -
07 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $299,768 $1,200,000 $481,507
8,985,639
kWh
$(-181,739.0)
-
MMBtu
- -
08 2.2135: Repair and eliminate steam leaks $2,279 $1,200 - - $2,279
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $312 $200 $312
5,569
kWh
- - -
10 2.4221: Install compressor air intakes in coolest locations $1,514 $500 $1,514
26,671
kWh
- - -
11 4.631: Install an uninteruptable power supply $37,500 $25,000 - - - $37,500
12 2.7491: Insulate glazing, walls, ceilings, and roofs $11,568 $4,642 $11,568
202,814
kWh
- - -
TOTAL RECOMMENDED $397,573 $1,271,604 $539,533
10,003,518
kWh
$(-181,739.0)
-
MMBtu
$2,279
-
MMBtu
$37,500
TOTAL IMPLEMENTED $84,723 $66,462 $44,944
788,394
kWh
- $2,279
-
MMBtu
$37,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs