Assessment Year | 1993 |
---|---|
Principal Product | Aluminum Patio Furniture |
NAICS |
n/a
|
SIC | 2514: Metal Household Furniture |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
650,000
ft2
|
Annual Production | 35,000
pieces
|
Production Hrs. Annual | 3,770
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,055 | 1,929,074 |
kWh
|
$0.074 |
Natural Gas | $38,809 | 6,747 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,915 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,491 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $3,864 | - |
$3,864
-
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $2,583 | $4,808 |
$2,583
34,877
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $522 | $705 |
$522
7,034
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $347 | $675 |
$347
4,689
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,005 | $2,000 |
$4,005
54,220
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $908 | $1,386 |
$908
12,309
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,010 | $8,108 |
$2,010
27,257
kWh
|
- | |
08 | 2.7135: Install occupancy sensors | $667 | $256 |
$667
9,086
kWh
|
- | |
09 | 2.7232: Replace existing hvac unit with high efficiency model | $528 | $1,070 |
$528
7,034
kWh
|
- | |
10 | 2.7261: Install timers and/or thermostats | $745 | $2,205 |
$745
16,706
kWh
|
- | |
11 | 2.2414: Use waste heat from hot flue gases to preheat | $736 | $2,600 | - |
$736
-
MMBtu
|
|
TOTAL RECOMMENDED | $16,915 | $23,813 |
$16,179
173,212
kWh
|
$736
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,491 | $6,194 |
$3,491
47,186
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs