Assessment Year | 1993 |
---|---|
Principal Product | Envelopes |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $5 M to 10M |
# of Employees | 58 |
Plant Area |
55,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,357 | 1,357,562 |
kWh
|
$0.078 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,777 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,195 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,496 | $247 |
$2,496
31,946
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $786 | $2,604 |
$786
9,965
kWh
|
|
03 | 2.7144: Install spectral reflectors / delamp | $6,088 | $6,904 |
$6,088
66,823
kWh
|
|
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,214 | - |
$2,214
28,429
kWh
|
|
05 | 2.7135: Install occupancy sensors | $1,456 | $1,076 |
$1,456
18,757
kWh
|
|
06 | 2.4133: Use most efficient type of electric motors | $1,891 | $4,866 |
$1,891
24,326
kWh
|
|
07 | 2.7232: Replace existing hvac unit with high efficiency model | $4,081 | - |
$4,081
52,462
kWh
|
|
08 | 2.2511: Insulate bare equipment | $290 | $134 |
$290
3,517
kWh
|
|
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,623 | $1,440 |
$1,623
20,809
kWh
|
|
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $133 | $50 |
$133
1,758
kWh
|
|
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $719 | $2,846 |
$719
9,086
kWh
|
|
TOTAL RECOMMENDED | $21,777 | $20,167 |
$21,777
267,878
kWh
|
||
TOTAL IMPLEMENTED | $5,195 | $4,425 |
$5,195
66,237
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs