ITAC Assessment: UF0059
ITAC logo
ITAC Assessment: UF0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Aircraft Components
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 68,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,148
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,423 4,153,576
kWh
Natural Gas $18,360 3,752
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,572

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,474 $6,866 $7,474
113,130
kWh
02 2.7144: Install spectral reflectors / delamp $8,660 $9,225 $8,660
108,441
kWh
03 2.7135: Install occupancy sensors $576 $128 $576
8,792
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $516 $476 $516
7,913
kWh
05 2.4133: Use most efficient type of electric motors $3,647 $8,906 $3,647
55,100
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,031 $1,450 $2,031
30,774
kWh
07 2.7232: Replace existing hvac unit with high efficiency model $4,420 $4,440 $4,420
66,530
kWh
08 2.7447: Install vinyl strip / high speed / air curtain doors $780 $350 $780
11,723
kWh
09 2.3212: Optimize plant power factor $26,535 $24,550 $26,535
-
kWh
TOTAL RECOMMENDED $54,639 $56,391 $54,639
402,403
kWh
TOTAL IMPLEMENTED $17,572 $21,662 $17,572
265,534
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs