| Assessment Year | 1993 |
|---|---|
| Principal Product | Aircraft Components |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
68,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 5,148
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $275,423 | 4,153,576 |
kWh
|
$0.066 |
| Natural Gas | $18,360 | 3,752 |
MMBtu
|
$4.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,639 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,572 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,474 | $6,866 |
$7,474
113,130
kWh
|
|
| 02 | 2.7144: Install spectral reflectors / delamp | $8,660 | $9,225 |
$8,660
108,441
kWh
|
|
| 03 | 2.7135: Install occupancy sensors | $576 | $128 |
$576
8,792
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $516 | $476 |
$516
7,913
kWh
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $3,647 | $8,906 |
$3,647
55,100
kWh
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,031 | $1,450 |
$2,031
30,774
kWh
|
|
| 07 | 2.7232: Replace existing hvac unit with high efficiency model | $4,420 | $4,440 |
$4,420
66,530
kWh
|
|
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $780 | $350 |
$780
11,723
kWh
|
|
| 09 | 2.3212: Optimize plant power factor | $26,535 | $24,550 |
$26,535
-
kWh
|
|
| TOTAL RECOMMENDED | $54,639 | $56,391 |
$54,639
402,403
kWh
|
||
| TOTAL IMPLEMENTED | $17,572 | $21,662 |
$17,572
265,534
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs