ITAC Assessment: UF0050
ITAC logo
ITAC Assessment: UF0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Bathtubs
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range $5
M
to 10
M
# of Employees 123
Plant Area 64,000
ft2
Annual Production 35,000
pieces
Production Hrs. Annual 4,498
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,085 902,403
kWh
Natural Gas $18,022 3,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,876 $1,499 $4,876
53,048
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,217 $3,011 $1,217
13,189
kWh
03 2.7144: Install spectral reflectors / delamp $8,451 $15,435 $8,451
81,770
kWh
04 2.7145: Install skylights $3,172 $2,175 $3,172
35,463
kWh
05 2.7232: Replace existing hvac unit with high efficiency model $540 $300 $540
3,517
kWh
06 2.4133: Use most efficient type of electric motors $1,792 $4,698 $1,792
22,274
kWh
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $528 $300 $528
6,741
kWh
08 2.4224: Upgrade controls on compressors $2,837 $1,500 $2,837
35,463
kWh
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,657 $550 $2,657
33,118
kWh
TOTAL RECOMMENDED $26,070 $29,468 $26,070
284,583
kWh
TOTAL IMPLEMENTED $11,610 $10,358 $11,610
131,887
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings