Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Manufactured Homes
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 259,100
ft2
Annual Production 720
units
Production Hrs. Annual 2,250
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,560 1,411,120
kWh
Electricity Demand $30,944 6,593
kW-mo/yr
Electricity Fees $15,154 -
Natural Gas $1,224,498 128,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2211: Use optimum temperature $9,149 $450 - - $9,149
-
MMBtu
-
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,650 $700 $3,360
69,525
kWh
$2,290
-
kW-mo/yr
- -
03 2.1113: Reduce combustion air flow to optimum $3,890 $500 - - $4,390
-
MMBtu
$(-500.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $517 $517 $368
7,380
kWh
$149
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $17,900 $58,500 $17,900
240,000
kWh
- - -
06 2.9114: Use solar heat to make electricty $10,600 $38,900 $9,050
185,000
kWh
$1,550
-
kW-mo/yr
- -
TOTAL RECOMMENDED $47,706 $99,567 $30,678
501,905
kWh
$3,989
-
kW-mo/yr
$13,539
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $33,216 $60,167 $21,628
316,905
kWh
$2,439
-
kW-mo/yr
$9,149
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs