Assessment Year | 2011 |
---|---|
Principal Product | Manufactured Homes |
NAICS | 321992: Prefabricated Wood Building Manufacturing |
SIC | 2451: Mobile Homes |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
259,100
ft2
|
Annual Production | 720
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,560 | 1,411,120 |
kWh
|
$0.052 |
Electricity Demand | $30,944 | 6,593 |
kW-mo/yr
|
$4.69 |
Electricity Fees | $15,154 | - |
|
- |
Natural Gas | $1,224,498 | 128,346 |
MMBtu
|
$9.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,706 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,216 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $9,149 | $450 | - | - |
$9,149
-
MMBtu
|
- | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,650 | $700 |
$3,360
69,525
kWh
|
$2,290
-
kW-mo/yr
|
- | - | |
03 | 2.1113: Reduce combustion air flow to optimum | $3,890 | $500 | - | - |
$4,390
-
MMBtu
|
$(-500.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $517 | $517 |
$368
7,380
kWh
|
$149
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $17,900 | $58,500 |
$17,900
240,000
kWh
|
- | - | - | |
06 | 2.9114: Use solar heat to make electricty | $10,600 | $38,900 |
$9,050
185,000
kWh
|
$1,550
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $47,706 | $99,567 |
$30,678
501,905
kWh
|
$3,989
-
kW-mo/yr
|
$13,539
-
MMBtu
|
$(-500.0) | ||
TOTAL IMPLEMENTED | $33,216 | $60,167 |
$21,628
316,905
kWh
|
$2,439
-
kW-mo/yr
|
$9,149
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs