ITAC Assessment: UF0045
ITAC logo
ITAC Assessment: UF0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product KITTY LITTER
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 135,000
ton
Production Hrs. Annual 8,112
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,967 6,256,448
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,557 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $645 $216 $645
16,413
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $136 $1,354 $136
2,638
kWh
03 2.6232: Install set-back timers $196 $720 $196
4,982
kWh
04 2.4133: Use most efficient type of electric motors $11,185 $17,919 $11,185
286,928
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,810 $325 $3,810
97,597
kWh
06 2.7233: Use properly designed and sized hvac equipment $585 $1,100 $585
14,947
kWh
TOTAL RECOMMENDED $16,557 $21,634 $16,557
423,505
kWh
TOTAL IMPLEMENTED $16,361 $20,914 $16,361
418,523
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs