ITAC Assessment: OK0295
ITAC logo
ITAC Assessment: OK0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WALLBOARD & PLASTER
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 565,000
ton
Production Hrs. Annual 8,640
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $713,457 31,375,147
kWh
Natural Gas $1,511,833 687,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $73,916 $54,162 $73,916
2,012,310
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,139 $4,563 $15,139
412,075
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,641 $11,362 $12,641
330,598
kWh
-
04 2.2511: Insulate bare equipment $3,121 $6,944 - $3,121
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,523 $704 $1,523
41,618
kWh
-
TOTAL RECOMMENDED $106,340 $77,735 $103,219
2,796,601
kWh
$3,121
-
MMBtu
TOTAL IMPLEMENTED $106,340 $77,735 $103,219
2,796,601
kWh
$3,121
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs