ITAC Assessment: UF0043
ITAC logo
ITAC Assessment: UF0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STEEL WIRE AND CABLE
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 24,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $416,016 5,971,571
kWh
Natural Gas $174,891 37,113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29 $52 $29
293
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12 $219 $12
293
kWh
-
03 2.6232: Install set-back timers $2,055 $1,200 $2,055
29,308
kWh
-
04 2.4133: Use most efficient type of electric motors $1,208 $72,171 $1,208
17,292
kWh
-
05 2.7233: Use properly designed and sized hvac equipment $93 $220 $93
1,465
kWh
-
06 2.3212: Optimize plant power factor $9,588 $9,900 $9,588
-
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $3,760 $1,000 - $3,760
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $18,164 $1,000 - $18,164
-
MMBtu
TOTAL RECOMMENDED $34,909 $85,762 $12,985
48,651
kWh
$21,924
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs