ITAC Assessment: SF0187
ITAC logo
ITAC Assessment: SF0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product PC Strand Wire, Saw Wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 110,000
ft2
Annual Production 350,000
ton
Production Hrs. Annual 6,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $587,068 14,735,453
kWh
Electricity Demand $35,274 34,695
kW-mo/yr
Natural Gas $43,831 17,971
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,271 - $2,271
26,269
kWh
- - - -
02 2.6215: Shut off air conditioning in winter heating season $1,393 - $1,393
34,979
kWh
- - - -
03 2.6218: Turn off equipment when not in use $3,336 $1,446 $3,000
75,330
kWh
$336
-
kW-mo/yr
- - -
04 2.6218: Turn off equipment when not in use $360 $370 $278
6,970
kWh
$82
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $1,236 $2,040 $1,181
29,650
kWh
$55
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $851 $2,250 $813
20,402
kWh
$38
-
kW-mo/yr
- - -
07 2.4239: Eliminate or reduce compressed air usage $1,569 $4,392 $1,499
37,616
kWh
$70
-
kW-mo/yr
- - -
08 2.7144: Install spectral reflectors / delamp $7,099 $32,250 $6,783
170,247
kWh
$316
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,849 $10,470 $1,739
43,645
kWh
$110
-
kW-mo/yr
- - -
10 3.5311: Recover and reuse waste material $1,085 - - - - $1,085
-
lb
-
11 3.5217: Reuse / recycle/ sell paper products $1,250 $150 - - - - $1,250
12 3.3131: Use evaporation to concentrate material $3,564 $5,500 - - $6,564
-
gal
- $(-3,000.0)
13 3.6111: Use alternative flocculent to minimize sludge volume $4,155 $19,400 $(-41.0)
(-3)
kWh
- - $4,196
-
lb
-
TOTAL RECOMMENDED $30,018 $78,268 $18,916
445,105
kWh
$1,007
-
kW-mo/yr
$6,564
-
gal
$5,281
-
lb
$(-1,750.0)
TOTAL IMPLEMENTED $25,863 $58,868 $18,957
445,108
kWh
$1,007
-
kW-mo/yr
$6,564
-
gal
$1,085
-
lb
$(-1,750.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs